Demo

Sample verify page — this is what a field worker sees after scanning the QR stamp on an issued drawing.

← Back to demo
TransmittalProof/Drawing verification
VERIFIED — Latest Approved Revision

P&ID — Amine Contactor Unit

Document No: AR1.3400.100.Z-340 ·  Revision: C

Drawing No.
AR1.3400.100.Z-340
Revision
C
Issued
14 November 2024
Issue type
Issued for Construction
Project
Ridgemont Gas Processing Facility
Status
Anchored on XRP Ledger
What this means

This drawing has been verified as the latest approved revision. It was issued on 14 November 2024 and the release record has been permanently anchored on the XRP Ledger. If this stamp does not match, do not proceed with work.

File integrity verifiedArtifact hash match

The hosted stamped PDF has been hash-verified against the SHA-256 recorded at issuance. The file has not been altered since it was released.

Filename:AR1.3400.100.Z-340_RevC_ISSUED.pdf
Issued SHA-256:e9b3a7d1f4c2e6b0d5a8c3f7b2e5a9d1c4f8b3e6a0d2c7f1b5e8a3d6c0f4b7e2
Verified: May 14, 2026, 3:11:28 p.m.
Release proof record
Ledger
XRP Ledger (XRPL)
Anchored
14 Nov 2024, 09:21 UTC
Network
Mainnet
TX hash
7E3F9A2C1B8D4E6A0F5C2D9B3A7E1F4C8B6D2E5A9C3F7B1E4D8A2C6F0B3E7A1D
Manifest hash
sha256:a3f7c2e1b9d4f6a0e5c8b3d2a7f1e4c9b6d0e5a2c3f8b1e4d7a9c6f2b0e3a7d1

Want this for your own drawings?

Issue controlled PDFs with tamper-evident QR stamps and permanent proof anchored on the XRP Ledger.

Request access← Back to demo
Sample Verify Page | TransmittalProof